0510 – UPS system restored to proper operation. All systems stable at this time.
0350 – UPS (non-emergency) system placed into bypass, and power restored. CPT technician en route – ETA 0500 – to restore battery protection.
0327 – Power restored to building, and systems normalizing.
At 0159 we sustained a power outage to parts of the data center. The generator systems activated and are running properly. At 0234, or UPS system (non-emergency) exhausted, and those systems went down.
UCSD FM has been contacted and confirmed loss of a high voltage circuit to the SDSC building. They are on campus now, troubleshooting the issue.
–Jeff
Jeff Filliez
Data Center Manager, SDSC